The Final Scores and Project Ranking for the Round 11 Clean Ohio Green Space Conservation Program are now available. The Natural Resources Assistance Council (NRAC) met on February 15 at 2:00 p.m. to review and discuss the final results.

The tables below are also available as a printable PDF.

Unweighted Scores

PRINCIPLES BENEFITS NEEDS OTHER FACTORS
RANK APPLICANT PROJECT
NAME
TOTAL
COST
NRAC
REQUEST
CUMULATIVE
REQUEST
PRSV ENH REST LKS PRVD ECON SOC ENV NDS OTH
$
COOR RDN IMDY MIN
RTS
TOTAL
POINTS
1 LAND Studio Irishtown Bend Greenway Connector $2,436,200 $1,425,700 $1,425,700 7.36 8.36 7.73 9.45 9.27 9.00 9.55 7.00 9.18 4.00 9.55 5.00 8.36 10.00 113.82
2 Western Reserve Land Conservancy Brecksville Upland Preserve $5,533,144 $2,213,144 $3,638,844 9.36 7.82 6.73 7.09 8.36 6.91 6.27 8.82 7.45 6.00 7.82 10.00 8.18 10.00 110.82
3 Cleveland Metroparks Preservation of Hemlock Creek Valley $250,000 $156,500 $3,795,344 8.64 8.00 6.09 9.09 8.82 6.64 7.64 8.36 7.45 4.00 7.09 10.00 6.64 10.00 108.45
4 City of Westlake Dover Ditch Stream Restoration $3,453,375 $777,000 $4,572,344 6.00 8.18 8.18 5.36 6.00 5.36 5.91 6.64 4.73 8.00 6.18 7.73 4.91 10.00 92.73
5 City of Fairview Park Coe Creek Daylighting and Restoration $442,688 $177,076 $4,749,420 5.00 7.36 9.36 4.09 2.45 4.45 3.45 7.45 5.36 6.00 7.18 6.09 6.18 10.00 84.45
TOTALS $12,115,407 $4,749,420

Weighted Scores

PRINCIPLES BENEFITS NEEDS OTHER FACTORS
RANK APPLICANT PROJECT
NAME
TOTAL
COST
NRAC
REQUEST
CUMULATIVE
REQUEST
PRSV ENH REST LKS PRVD ECON SOC ENV NDS OTH $ COOR RDN IMDY MIN
RTS
TOTAL
POINTS
1 LAND Studio Irishtown Bend Greenway Connector $2,436,200 $1,425,700 $1,425,700 22.09 16.73 15.45 28.36 18.55 9.00 19.09 21.00 27.55 4.00 9.55 5.00 8.36 10.00 214.73
2 Cleveland Metroparks Preservation of Hemlock Creek Valley $250,000 $156,500 $1,582,200 25.91 16.00 12.18 27.27 17.64 6.64 15.27 25.09 22.36 4.00 7.09 10.00 6.64 10.00 206.09
3 Western Reserve Land Conservancy Brecksville Upland Preserve $5,533,144 $2,213,144 $3,795,344 28.09 15.64 13.45 21.27 16.73 6.91 12.55 26.45 22.36 6.00 7.82 10.00 8.18 10.00 205.45
4 City of Westlake Dover Ditch Stream Restoration $3,453,375 $777,000 $4,572,344 18.00 16.36 16.36 16.09 12.00 5.36 11.82 19.91 14.18 8.00 6.18 7.73 4.91 10.00 166.91
5* City of Fairview Park Coe Creek Daylighting and Restoration $442,688 $177,076 $4,749,420 15.00 14.73 18.73 12.27 4.91 4.45 6.91 22.36 16.09 6.00 7.18 6.09 6.18 10.00 150.91
TOTALS $12,115,407 $4,749,420

 *A minimum score of 156 points, 60% of total weighted points available, is required by District One NRAC to be considered for funding.

ROUND 11 ALLOCATION $ 3,339,704
ADMINISTRATIVE COST $(15,000)
ROUND 10 AVAILABLE BALANCE $11,065
TOTAL AVAILABLE $3,335,769
AMOUNT RECOMMENDED $1,582,200
AMOUNT REMAINING $1,753,569


Key To Criteria:
PRSV – Preserves
ENH – Enhances
REST – Restores
LKS – Links
PRVD  – Provides
ECON – Economic
SOC – Social
ENV- Environmental
NEEDS – Needs of the District
OTH $ – Other Funding
COOR – Coordination
RDN – Readiness to Proceed
IMDY  – Immediacy
MIN RTS – Mineral Rights